![trex railing system installation instructions trex railing system installation instructions](https://iwpllc.com/wp-content/uploads/2019/03/Trex-Railing-Bay-View.jpg)
- #Trex railing system installation instructions how to
- #Trex railing system installation instructions install
This will serve as the location for the footblock attachment, which will be installed last. Step 5: Prepare Footblock Hole for Bottom RailĪttaching the footblocks requires you to invert the bottom rail, center and drill a hole using a 3/16” drill bit. Tip: If using optional gaskets, subtract 1/16” from each end of the rail before cutting. Once cut remove the baluster spacers from the rails. Cut rails and baluster spacers to the same length. Snap baluster spacers into rails, and place rails between posts ensuring baluster holes are equally spaced from each post. Step 4: Cutting Railings and Baluster SpacersĮnsure posts are plumb. Once fitted, secure the RSBs with the 2” wood screws that are provided in the railing kit and remove the template. Secure the template on the post with either tape or a rubber band to ensure that the bottom of the template rests on the recently added post skirt.
![trex railing system installation instructions trex railing system installation instructions](https://online.pubhtml5.com/vyzj/agzi/files/page/2.jpg)
It’s important to place the top RSBs flat-side up and bottom RSBs flat side down.
![trex railing system installation instructions trex railing system installation instructions](https://mobileimages.lowes.com/productimages/1265b3e6-49d5-4b5b-b41d-a357cd9066f2/05300824.jpg)
Start by placing your railing support brackets (RSB) in the Tre圎xpress™ template (included as a part of the post sleeve box). Note: Shims can be used to plumb post sleeves. Then, slide the post sleeve over the post and position it inside the post sleeve skirt.
#Trex railing system installation instructions install
Step 2: Install Post Sleeve Skirts and Post Sleevesįor installing deck railing posts, begin by sliding the post sleeve skirt over the post, all the way down so it rests on the deck surface. Ensure all local building codes are understood and followed. The attachment of the posts to the substructure is one of the most critical parts of a railing system. Note: Blocking can be added for extra strength, please verify with your local building code official. You can also countersink the bolts to be flush with your framing to allow for fascia attachment. Keep in mind that the minimum joist size is 2” x 8” and the top bolts must be 1” from the top of the joists with bottom bolts 5-1/8” from the top bolts. Once the appropriate length is confirmed, you’ll use ½” carriage bolts to attach the posts. They should be installed 6’ or 8’ on center to accommodate for appropriate railing length. When installing posts, review the actual lengths of the railing and set posts accordingly.
#Trex railing system installation instructions how to
With more colors and component profiles than any other railing, Trex Transcend railing provides quality, durability, and requires very little upkeep.įollow this simple 11-step guide to learn how to install your Trex Transcend horizontal railing and posts. Trex Transcend® railing is our highest-performing composite railing option, giving you a first-in-class design and seemingly endless options - as well as a 25-year performance warranty. For any home project, be certain to follow local code and permitting requirements.